Premium Industrial Foaming Systems for Enhanced Production Efficiency

Product Details
Customization: Available
After-sales Service: Permanent After-Sales Service
Warranty: 1year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
Patents Awarded
The supplier had awarded 3 patents, you can check the Audit Report for more information
to see all verified strength labels (28)
  • Premium Industrial Foaming Systems for Enhanced Production Efficiency
  • Premium Industrial Foaming Systems for Enhanced Production Efficiency
  • Premium Industrial Foaming Systems for Enhanced Production Efficiency
  • Premium Industrial Foaming Systems for Enhanced Production Efficiency
  • Premium Industrial Foaming Systems for Enhanced Production Efficiency
  • Premium Industrial Foaming Systems for Enhanced Production Efficiency
Find Similar Products

Basic Info.

Model NO.
DCIB075
Raw Material
Mixing
Principle
High-Pressure Air Type
Automation
Automatic
Certification
ISO9001:2008
Transport Package
Seaworthy Packing
Specification
machine
Trademark
hui
Origin
China
HS Code
8477101090

Product Description

 
Feeding and mixing: Add a certain amount of cement, foaming agent, and foam stabilizer to the mixer through the feeding system, and dry mix for 30 seconds;
2. Mixing: Add a certain amount of warm water to the mixer and stir wet for 2 minutes; Add a certain amount of foaming agent to the mixer and stir for 8-15 seconds;
3. Injection molding and foaming: Immediately inject the slurry into the mold to foam, and the foaming process takes about 3-5 minutes;
4. Initial maintenance: After the injection molding is completed, let it stand for several hours for initial maintenance;
5. Demoulding: The foam cement insulation board can be demolded when it has completed initial setting and has initial strength;
6. Cutting: The foam cement insulation board blank with a certain strength can be cut after demolding, and the cutting specifications can be adjusted according to the needs of the cutting blade;
7. Finished product maintenance: The maintenance period of foam cement insulation board should not be less than 7 days
Premium Industrial Foaming Systems for Enhanced Production EfficiencyPremium Industrial Foaming Systems for Enhanced Production EfficiencyPremium Industrial Foaming Systems for Enhanced Production EfficiencyPremium Industrial Foaming Systems for Enhanced Production EfficiencyPremium Industrial Foaming Systems for Enhanced Production Efficiency

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier