Feeding and mixing: Add a certain amount of cement, foaming agent, and foam stabilizer to the mixer through the feeding system, and dry mix for 30 seconds;
2. Mixing: Add a certain amount of warm water to the mixer and stir wet for 2 minutes; Add a certain amount of foaming agent to the mixer and stir for 8-15 seconds;
3. Injection molding and foaming: Immediately inject the slurry into the mold to foam, and the foaming process takes about 3-5 minutes;
4. Initial maintenance: After the injection molding is completed, let it stand for several hours for initial maintenance;
5. Demoulding: The foam cement insulation board can be demolded when it has completed initial setting and has initial strength;
6. Cutting: The foam cement insulation board blank with a certain strength can be cut after demolding, and the cutting specifications can be adjusted according to the needs of the cutting blade;
7. Finished product maintenance: The maintenance period of foam cement insulation board should not be less than 7 days